Improving Road Safety on Barrio Manantial's Main Street

Improving Road Safety on Barrio Manantial's Main Street

A concrete slab was poured to repair a sinkhole on Barrio Manantial's main street, enhancing road safety for pedestrians and motorists.

As part of the actions to address damage to road infrastructure, a concrete slab, approximately 6 x 11 meters, was poured on-site to repair a sinkhole on the main street of Barrio Manantial.
The Municipal Government of Santa María Huatulco, presided over by Eng. Julio Cárdenas, through the Public Works Department, continues to carry out maintenance and repair actions on the municipality's roadways, prioritizing works that guarantee greater safety for pedestrians and motorists, as well as the improvement of urban infrastructure for the benefit of the population.

Gallery

8 photos
Share: